BIM Coordination

Minimize rework in the field and bring your project to life with improved BIM coordination.

Identify issues quickly and easily, keep everyone on the same page, and empower your BIM teams to work more efficiently with automated clash detection and powerful BIM tools.

Instantly view all constructability issues.

Nothing is more frustrating than models with hundreds of costly errors. Catching errors early saves construction teams both time and money.

That is why automated clash detection is so important; it improves the quality of a model so that BIM leaders can spend less time on small errors and more time on the most important constructability issues.

Clash detection feature highlighting constructibility issues in construction software.

Easily create and manage issues.

Issue management should be a collaborative and transparent process, but a lack of accessibility to real-time issues can quickly weaken the accountability and quality of a model.

Using BIM coordination, teams can easily create and assign issues and then track issues to resolution. Collaboration can take place at any time during the coordination process, accelerating delivery of quality of construction documents.

Schematic of construction issue overlain on a known issue that needs to be resolved through construciton model coordination.

Always work from the latest model.

Without access to the latest model changes, BIM teams can waste hours and increase the likelihood of errors.

Working off the latest model should be automatic. With BIM coordination, it is. As design and trade teams upload new models to the coordination space, the most recent model and its previous versions are instantly available to anyone viewing or running clash detection.

Construction model coordination enables team members from across the construction team to work together on the same model with latest changes. Image of team contributors that access the same model.

Collaborate with Revit and Navisworks users.

Staying connected to changes made to the model can save hours in coordination. That’s why closing the loop between design and construction teams is so essential. Managers can ensure their design and trade teams can collaborate all the way to issue resolution.

Because issues identified during coordination are shared between Navisworks and Revit, teams can quickly resolve these issues and get to a constructible model faster.

Construction issue overlain over Navisworks issues.
 

Simplify the BIM workflow between design and construction.

ico_document-management
Centralize Project Documents

Managers can ensure teams are always collaborating and using the most up-to-date design data within a common data environment.

Learn More
ico_quality-management
Proactive Quality Management

Gain visibility into all project issues and resolve them earlier. Reduce costly rework and keep projects on schedule.

Learn More
ico_model-cooridination
Design Collaboration

Turn design documentation into a robust, project-based record to streamline data sharing between internal or external project teams.

Learn More
 
Quotation mark

"Due to BIM coordination and multi-discipline collaboration, our project was delivered with less than 1% rework—on a typical job, we expect to have between 8% to 10% rework."

- RUSS DALTON, AECOM

Get started with Model Coordination.

Leverage Deep Integrations

Bring together coordination and issue tracking workflows, allowing project teams to leverage the best functionality from each product.

BIM Success Story

Creating the Afsluitdijk, a 32 km dam, in the Netherlands, was a complex, multidisciplinary undertaking.

Benefits of Centralized Meeting Minutes

Improve team coordination and project tracking and provide clear visibility into the commitments made with centralized meeting minutes.