Skip to main content

Winning in Preconstruction and Beyond With BIM

 

According to McKinsey, large construction projects across asset classes take an average of 20 percent longer than scheduled and finish up to 80 percent over-budget. Most of the factors that cause these issues become obvious late in the construction process—but with the right preconstruction strategy, teams can prevent them from ever happening.

In this guide, you’ll learn:

  • How an integrated preconstruction strategy helps drive more accurate schedules

  • Advanced methods to demonstrate visuals of the project scope and sequence

  • Better ways to communicate with the owners and coordinate between stakeholders during preconstruction.

Download the guide today!