Skip to main content

Top 10 Benefits of BIM in Construction

BIM has been the talk of the town in the AEC industry for several years. Yet, for all the talk, there is a lot of confusion about BIM in construction and how it can help contractors. One common misconception is that BIM is merely a technology, or that it only refers to 3D design (though 3D models are indeed at the core of BIM). BIM is actually a process for creating and managing all of the information about a project, leading to an output known as a Building Information Model, which contains digital descriptions for every aspect of the physical project.

While BIM is mostly associated with design and preconstruction, it absolutely benefits every phase of the project life-cycle, even well after building is complete. Building Information Modeling allows projects to be built virtually before they are constructed physically, eliminating many of the inefficiencies and problems that arise during the construction process.

Here are the 10 greatest benefits of BIM in construction:

1. Improve Onsite Collaboration and Communication 

bim-in-construction-collaboration

Digital BIM models allow for sharing, collaborating, and versioning that paper drawing sets don’t. With cloud-based tools such as Autodesk’s BIM 360, BIM collaboration can seamlessly occur across all disciplines within the project. The BIM 360 ecosystem allows teams to share project models and coordinate planning, ensuring all design stakeholders have insight into the project.

Cloud access also allows project teams to take the office to the field. With apps such as Autodesk’s BIM 360 tools, teams can review drawings and models onsite and on their mobile devices, ensuring they have access to up-to-date project information at any time.

2. Model-Based Cost Estimation

bim-in-construction-cost-estimation

Many AEC firms are realizing that including estimators earlier in the planning stage allows for more effective construction cost estimation, which has led to the growth of model-based cost estimating (also known as 5D BIM). Using BIM tools such as Autodesk’s Revit and BIM 360 Docs automates the time-consuming task of quantifying and applying costs, allowing estimators to focus on higher value factors, such as identifying construction assemblies and factoring risks.

3. Visualize Projects in Preconstruction

cannistraro-modular-construction-technology-body-7

By using BIM, you can plan and visualize the entire project during preconstruction, before the shovel hits the ground. Space-use simulations and 3D visualizations allow clients to experience what the space will look like offering the ability to make changes before construction start. Having a greater overview from the beginning minimizes expensive and time-consuming changes later.

4. Better Coordination and Clash Detection

bim-in-construction-clash-detection

BIM allows you to better coordinate trades and subcontractors, detecting any MEP, internal, or external clashes before construction begins. Will the electrical conduits clash with a steel beam? Do the doorways have enough clearance? With Autodesk’s BIM 360 Glue you can avoid clashes with automated clash detection.

Reduce the amount of rework needed on any given job by avoiding clashes. With BIM, you have the opportunity to plan it right before you build onsite. You can avoid last-minute changes and unforeseen issues by enabling easy reviewing and commenting across multiple disciplines.

5. Mitigate Risk and Reduce Cost

bim-in-construction-technology

One study by McKinsey found that 75% of companies that have adopted BIM reported positive returns and on their investments. But BIM can save you money in a myriad of ways if you take advantage of it. Closer collaboration with contractors can lead to reductions in tender risk premiums, lower insurance costs, fewer overall variations, and fewer opportunities for claims. Better overview of the project before starting allows for more prefabrication and reduces waste on unused materials. Prefabricated elements can be easily bolted in place rather than created on-site. Labor costs spent on documentation work and miscommunications are reduced. Many companies are using BIM and construction technology to reduce costs and mitigate risk.

With an ever-increasing number of team members using project data, real-time collaboration and a single document repository such as BIM 360 Docs reduces the risk of any company using outdated information. Making sure the right information is available at the right time is essential to completing a successful quality project.

6. Improved Scheduling/Sequencing

bim-in-construction-schedule-setbacks

In the same way that many of these benefits save money, they save time by reducing the time of project cycles and eliminating construction schedule setbacks. BIM allows design and documentation to be done at the same time, and for documentation to be easily changed to adapt to new information such as site conditions. Schedules can be planned more accurately and communicated exactly, and the improved coordination helps projects be more likely to be completed on-time or early.

7. Increase Productivity with Prefabrication 

bim-modular-construction-technology-body-2-1

BIM data can be used to instantly generate production drawings or databases for manufacturing purposes, allowing for increased use of prefabrication and modular construction technology. By designing, detailing and building offsite in a controlled environment, you can diminish waste, increase efficiency, and reduce labor and material costs.

8. Better Safety on Construction Sites

machine-learning-body-3

BIM can help improve construction safety by pinpointing hazards before they become problems, and avoid physical risks by visualizing and planning site logistics ahead of time. Visual risk analysis and safety evaluations can help ensure safety over the course of the project execution.

9. Execute Overall Better Builds

reality-capture-body-featured

The increased reliability of a coordinated model leads directly to greater building quality. By sharing common BIM tools, more experienced team members work together with builders through all phases of the project, providing better control over technical decisions around design execution. The optimal ways to construct a project can be tested and chosen early in the project, and structural deficiencies can be identified before building. With the use of visualizations, better design aesthetics can be more easily chosen, such as modeling the flow of natural light into a building. Then, during construction, reality capture technology can be utilized to improve accuracy. 

10. Streamline Facility Management and Strengthen Building Handover

bim-in-construction-software

The information in a model also empowers operation of the building after construction is over, providing an ROI well after project completion. Using construction software, an accurate, ongoing digital record of building information is valuable for facilities management and renovators for the entire lifecycle of the building. Data can be sent into existing building maintenance software for post-occupancy use.  Using a tool such as Autodesk’s BIM 360 Ops, contractors can transform building handover by connecting BIM data generated during design and construction to building operations.

Building Information Modeling has become an invaluable tool with an abundance of benefits for the construction industry. Projects utilizing BIM have a greater chance of success and maximize effectiveness for every stage of the project lifecycle and beyond.